Automotive Case Studies

One of the Big Three automobile manufacturers
Virginia Beach, VA – 10 Acres
Project Scope:
 One of the Big Three auto manufacturers had been leasing multiple off-site parking areas, making inventory management difficult. The costs of transporting vehicles between sites plus the expenses of additional damage, inspection and security were high. Alternative permanent sites were found to be cost prohibitive, with permitting requiring one to two years.
TemPark Advantage: Because of its soil characteristics, the local county’s former ten-acre landfill could not be developed in other ways. Because of TemPark’s permeability, the land was successfully re-purposed. And, compared to the off-site leasing, TemPark cut the company’s costs by more than 30 percent. Imagine turning trash into treasure... Ford’s a fan > [top]

cars
 
A 10-Acre Comparison
Gravel vs. TemPark at Virginia Beach

  Gravel TemPark™

Time        
Engineer   3 Weeks   3 Days
Permit Review Process   6 Weeks   2 Weeks
Engineer   9 Weeks   2 Weeks

TOTAL   17 Weeks   4 Weeks, 3 Days

Cost*        
Survey/Storm Water   $32,750   TemPark hard cost was less than gravel
Erosion Control   16,750    
Top Soil Strip   96,120    
Find Grade   75,000   TemPark was reinstalled at another site and client recovered over 50% of material cost*
Retention Basin   45,000    
Ditching   40,000    
Culverts, Basins, Outlets   25,000    
Gravel (6")   216,000    
Seeding   20,000   Site was returned to nature with minimal intrusion

TOTAL   $566,620    
  Another one of the Big Three automobile manufacturers
Ypsilanti, MI – 100 Acres
Project Scope:
Customer had leased multiple off-site parking areas, complicating inventory management. Costs were high based on transportation of vehicles between sites plus the additional expenses of inventory damage, inspection, and security. Permanent sites were evaluated and found cost-prohibitive with permitting to take 1-2 years.
TemPark Advantage: As a full turnkey project, TemPark consolidated 10 sites into 1. TemPark procured the site, performed full soil testing/engineering, designed the solution and delivered the completed project ahead of schedule and under budget. Permitting was completed in 60 days. Customer saved 50% of hard costs.
Ford’s a fan >
[top]
cars
Another of the Big Three automobile manufacturers
Oakville, Ontario, Canada – 57 Acres

Project Scope:
This customer wanted to single-source project based off a vendor’s core competency to deliver a turnkey parking area. Because of Canadian zoning restrictions, no other resource was able to provide both site procurement and complete permitting for a permanent facility.
TemPark Advantage: The TemPark team found this 57-acre site and successfully completed all permitting. A completely turnkey solution, the cost of this project was able to be 100% expensed as tax deduction immediately as opposed to the long-term amortization of a permanent site improvement. [top]
cars
Another of the Big Three automobile manufacturers
Chicago, IL – 25 Acres
Project Scope:
Multiple off-site locations created the typical inventory management headaches and transportation costs – plus the additional expenses of inventory damage, inspection and security.
TemPark Advantage: By consolidating the capacity of multiple sites into a single, secure area, TemPark saved cash. [top]
cars
  Hayes Wheels
Romulus, MI – 1 Acre
Project Scope:
Asphalt considered too expensive.
TemPark Advantage: TemPark designed a high-quality solution that was saved 80% of the cost of asphalt – in radically less time. [top]